회의:
공개 회의 - TMDL 시행 계획 - 마운틴 런, 머디 런 및 하류 헤이즐 강
| 회의 세부 정보 | |
|---|---|
| 날짜/시간 | 2/3/2022 6:00 오후 |
| 유형 | 물리적 위치만 |
| 위치 | Lenn Park Pavilion, 19206 Edwin Way, Culpeper VA 22701 |
| 이사회 웹사이트 | http://www.deq.virginia.gov |
| 의제 문서 | 대행사가 게시하지 않았습니다. |
| 회의록 문서 | 대행사가 게시하지 않았습니다. |
| 장애인 친화적? 예 요청 시 청각 장애인 통역사가 제공 되나요? 예 | |
| 회의 목적 [Note: Seating in the pavilion meeting room will be set up to allow for social distancing. DEQ also expects meeting participants to wear a mask during the meeting. In the event of inclement weather, this meeting will be held at the same time and location on Thursday, February 10, 2022.] The purpose of the meeting is for the Department of Environmental Quality (DEQ) to receive written and oral comments from interested persons on the development of a clean-up plan, also known as a Total Maximum Daily Load (TMDL) Implementation Plan. The plan was developed for the following streams located in Culpeper County, Virginia: Flat Branch, Indian Run, the (lower) Hazel River, Jonas Run, Mountain Run, Mountain Run Reservoir, Muddy Run, an Unnamed Tributary to Jonas Run, and Waterford Run. These streams are listed on the 303(d) TMDL Priority List and Report as impaired due to violations of the State’s water quality standards for bacteria. The public comment period will begin on February 4, 2022 and end on March 7, 2022. Throughout the 30-day public comment period, the draft IP can be found at the website linked below: https://www.deq.virginia.gov/water/water-quality/implementation/implementation-plans-under-development | |
| 회의 범위 |
제안된 단계에 대한 의견 수렴을 위한 공청회
X
이사회 일반 업무
특정 규정/장 논의
|
| 연락처 정보 | |
|---|---|
| 이름/직함: | 데이비드 에반스 |
| 주소: |
13901 크라운 법원 Woodbridge, 22193 |
| 이메일 주소: | david.evans@deq.virginia.gov |
| 전화: | (703)583-3835 팩스: (804)698-4178 TDD: ()- |


