회의:
운영위원회 회의 - 버치 크릭 및 댄 강 유역 정화 계획(Halifax 카운티)
| 회의 세부 정보 | |
|---|---|
| 날짜/시간 | 5/24/2018 1:30 오후 |
| 위치 | Danville Regional Airport, East Conference Room, 424 Airport Drive, Danville, VA 24540 |
| 이사회 웹사이트 | http://www.deq.virginia.gov |
| 의제 문서 | 대행사가 게시하지 않았습니다. |
| 회의록 문서 |
회의록
6/4/2018 (48k)
FINAL
|
| 장애인 친화적? 예 요청 시 청각 장애인 통역사가 제공 되나요? 예 | |
| 회의 목적 The Virginia Department of Environmental Quality (DEQ) announces a meeting of the steering committee to review the draft Birch Creek and Dan River Watersheds Cleanup Plan. The steering committee will review technical aspects of the draft document before the document is presented to the public in June. DESCRIPTION OF STUDY: The Virginia Department of Environmental Quality is working to develop a cleanup plan with strategies for reducing levels of bacteria and sediment entering streams. The cleanup plan is designed to meet the bacteria reduction goals established by the following Total Maximum Daily Load (TMDL) studies: The Birch Creek TMDL study was approved by EPA in 2004 and by the State Water Control Board in 2005, and can be found in the Bacteria TMDL for Birch Creek Watershed, Virginia report (available at http://www.deq.virginia.gov/portals/0/DEQ/Water/TMDL/apptmdls/roankrvr/birchfc.pdf.) The Dan River TMDL was approved by EPA in 2008 and approved by the State Water Control Board in 2009, and can be found in the Bacteria TMDL Development for the Dan River, Blackberry Creek, Byrds Branch, Double Creek, Fall Creek, Leatherwood Creek, Marrowbone Creek, North Fork Mayo River, South Fork Mayo River, Smith River, Sandy Creek, and Sandy River Watersheds report (available at http://www.deq.virginia.gov/portals/0/DEQ/Water/TMDL/apptmdls/roankrvr/danec.pdf.) The Henry County and Patrick County portions of the Dan River TMDL Watershed were included in the South Mayo River, North Mayo River, Blackberry Creek, Marrowbone Creek, Leatherwood Creek and Smith River Watershed Implementation Plan (2013) (available at http://www.deq.virginia.gov/Portals/0/DEQ/Water/TMDL/ImplementationPlans/Smith-Mayo_Technical_Report_FINAL.pdf.) The following are the names of the bacteria “impaired” stream and the length of the impaired segments: Cascade Creek, 11.79 miles; Tanyard Creek, 2.85 miles; Sugartree Creek, 6.96; Stewart Creek, 7.34 miles; Pumpkin Creek, 4.28 miles; Cane Creek, 12.25 miles; Lawless Creek, 4.71 miles; Big Toby Creek, 7.56 miles; Powells Creek, 4.63 miles; Sandy Creek, 9.41 miles; UT-Birch Creek, 5.35 miles; Germy Creek, 5.36 miles; Lawsons Creek, 8.26, 7.27 miles; Miry Creek, 1.11 miles; Stokes Creek, 6.35 miles; Sandy River, 7.22 miles; Sandy Creek, 9.48 miles; Dan River, 35.06 miles; Fall Creek, 11.97 miles; Double Creek, 8.88 miles; Byrds Branch, 3.76 miles. For additional information, please contact the staff person listed below. | |
| 회의 범위 |
제안된 단계에 대한 의견 수렴을 위한 공청회
X
이사회 일반 업무
특정 규정/장 논의
|
| 연락처 정보 | |
|---|---|
| 이름/직함: | James Moneymaker |
| 주소: |
DEQ Blueridge Regional Office 3019 Peters Creek Road Roanoke, 24019 |
| 이메일 주소: | james.moneymaker@deq.virginia.gov |
| 전화: | (540)562-6738 팩스: (804)562-6725 TDD: ()- |



