| 조치 요약 |
The amendments to the state’s Water Quality Management Planning Regulation (9 VAC 25-720) include revising seven existing TMDL waste load allocations and adding twelve new TMDL waste load allocations in the James River Basin (9 VAC 25-720-60.A), two new TMDL waste load allocations in the Chowan River – Dismal Swamp River Basin (9 VAC 25-720-100.A), and two revised TMDL waste load allocations in the Chesapeake Bay – Small Coastal-Eastern Shore River Basin (9 VAC 25-720-110.A). The TMDLs were developed in accordance with Federal Regulations (40 CFR § 130.7) and are exempt from the provisions of Article II of the Virginia Administrative Process Act. The TMDL reports were subject to the TMDL public participation process and the waste load allocations are adopted as part of 9 VAC 25-720 in accordance with Virginia’s “Public Participation Procedures for Water Quality Management Planning”. |