액션:
비활성 CCR 표면 저류지 관련 요구 사항에 대한 EPA 개정 사항 통합
액션 4775
 
일반 정보
조치 요약 On August 5, 2016, EPA published in the Federal Register a direct final rule titled “Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Extension of Compliance deadlines for Certain Inactive Surface Impoundments; Response to Partial Vacatur.” The federal rule became effective October 4, 2016. The revised federal rule modified the requirements certain inactive coal combustion residuals (CCR) surface impoundments are required to meet. Prior to this rule, federal regulations allowed inactive CCR surface impoundments to complete closure by April 17, 2018 and meet other notification requirements (“early closure provision”) to avoid having to meet the same requirements as existing CCR surface impoundments. This provision was included in EPA’s rule to incentivize the early closure of inactive CCR surface impoundments. Prior to EPA’s revised rule, CCR surface impoundments were allowed to close the CCR surface impoundment by leaving CCR in place, removing free liquids, and installing a final cover system designed to minimize infiltration and erosion. CCR surface impoundments were also allowed to remove the CCR from the surface impoundment as part of closing the surface impoundment. The federal rule did not require inactive surface impoundments to meet design, operating criteria, groundwater monitoring, corrective action, or closure and post closure care requirements. Virginia’s regulations however did require inactive CCR surface impoundments to conduct groundwater monitoring and post closure care monitoring and these activities would be included in a permit for the inactive surface impoundment. The US Court of Appeals for the D.C. Circuit court ordered a vacatur of the “early closure” provisions for inactive CCR surface impoundments on June 14, 2016 and EPA issued a direct final rule that became effective October 4, 2016. The federal rule now requires inactive CCR surface impoundments that were complying with the “early closure” provision to meet the same requirements as existing CCR surface impoundments. This includes meeting the requirements for design, operating criteria, groundwater monitoring, corrective action, closure and post closure care requirements that are all applicable to existing CCR surface impoundments. EPA has extended the compliance deadlines for qualifying inactive CCR surface impoundments to comply with these requirements. Compliance deadlines for inactive surface impoundments are being extended by 547 days (the number of days between the signature date of the final EPA rule and the last business day of the week during which the order from the count granting the motion to vacate 40 CFR 257.100 (b), (c), and (d) was signed). Virginia previously adopted the federal requirements concerning CCR landfills and surface impoundments by incorporating the federal requirements by reference into Virginia’s Solid Waste Management Regulations (VSWMR). This regulatory amendment incorporates the revised federal requirements concerning these inactive CCR surface impoundments into the VSWMR.
영향을 받는 챕터 이 장에만 적용됩니다.
집행부 검토 이 조치는 행정절차법 제10조( 2 )에 따라 면제됩니다. 일반적인 집행부 검토 절차는 필요하지 않습니다. 따라서 게시를 위해 직접 제출할 수 있으며 게시 즉시 효력이 발생합니다.
면제 인용: § 2.2-4006.A.4.c of the APA
RIS 프로젝트 예  [004944 ]
새로운 정기 검토 이 조치는 새로운 정기 검토를 수행하는 데 사용되지 않습니다.
 
단계
이 규제 조치와 관련된 단계.
스테이지 ID 스테이지 유형 상태
7853 최종 스테이지 완료. 이 규정은 05/03/2017 에서 발효되었습니다.
 
연락처 정보
이름/직함: 브렌트 윌리엄스 / 재무 지원실 이사 & 폐기물 프로그램
주소: 1111 이스트 메인 스트리트, 스위트 1400
P.O. Box 1105
리치몬드, 버지니아주 23218
이메일 주소: brent.williams@deq.virginia.gov
전화: (804)512-7826    팩스: ()- TDD: ()-