| 조치 요약 |
The amendments to the state’s Water Quality Management Planning Regulation (9 VAC 25-720) include three new TMDL waste load allocations in the Potomac-Shenandoah River Basin (9 VAC 25-720-50.A), four new TMDL waste load allocations in the James River Basin (9 VAC 25-720-60.A), one new TMDL waste load allocation in the Tennessee-Big Sandy River Basin (9 VAC 25-720-90.A), fourteen new TMDL waste load allocations in the York River Basin (9 VAC 25-720-120.A), nine new TMDL waste load allocations in the New River Basin (9 VAC 25-720-130.A), replacement of two existing TMDL waste load allocations with revised values in the James River Basin (9 VAC 25-720-60.A), incorporation of four technical corrections in the Potomac-Shenandoah River Basin (9 VAC 25-720-50.A), incorporation of two technical corrections in the Tennessee-Big Sandy River Basin (9 VAC 25-720-90.A), and incorporation of two technical corrections in the Chesapeake Bay-Small Coastal-Eastern Shore River Basin (9 VAC 25-720-110.A). |